From Fragmented to Flowing: A Cohesive Kitchen Remodel
- Improve the layout and functionality.
- Gain more storage.
- Create a more enjoyable space.
Kitchen Cost Category: Midrange Premium
Project Overview
When Mary and Deric approached us, they were in dire need of ideas to maximize their kitchen space and improve the overall flow of their first floor.
They had been gradually updating other parts of their home, but when their dishwasher broke down, they knew it was time to address the kitchen.
Project Developer
Trish Barley, AKBD
Lead Carpenter
Matt Wagner
Design Concepts
Scope of Work
The primary objective of this remodel was to create a more open and inviting space that enhances the flow and functionality of the kitchen and first floor. Initially, the separation between the kitchen, dining area, and formal living room created a fragmented layout. The entryway was cramped, and the kitchen's outdated design contributed to a darker environment. To address these issues, we reconfigured the layout by removing the wall between the kitchen and the formal living room, as well as the partial walls separating the kitchen from the dining area, resulting in a seamless, open-concept space that promotes better flow and interaction.
By reconfiguring the kitchen layout, we created a more open and welcoming entryway. The stairs, visible from the front door, were updated to serve as a focal point, enhancing the entryway's visual appeal. The kitchen renovation included the installation of new custom cabinetry, high-quality quartz countertops, and a classic yet elevated white tile backsplash. Stainless steel appliances were added to enhance functionality.
The dining area now seamlessly integrates with the kitchen, featuring improved lighting and a cohesive design. Recessed lighting throughout the kitchen and dining area, along with pendant lights above the kitchen island, provided ample illumination and a stylish focal point. New LVP flooring was installed throughout the kitchen and adjoining areas, creating a uniform look and adding warmth to the space.
The completed remodel transformed the kitchen and first floor into a bright, open, and welcoming space that meets the homeowners' needs and preferences. The new layout improves functionality and enhances the home's overall aesthetic, creating a modern and cohesive environment ideal for both everyday living and entertaining.
Project Timeline
Project Development Start
January 18, 2024
Production Start
April 1, 2024
Project Completion
May 24, 2024
Mary and Deric had a clear vision of their dream kitchen. With the assistance of our Project Developer, Trish, they collaborated effectively to bring their vision to life, making quick decisions and progressing swiftly through the design phase.
The pre-production phase, which included ordering materials, managing product lead times, and scheduling trade partners, took just over a month. Once construction began, the typical kitchen remodel timeframe of 6-10 weeks was extended due to the extensive scope of work and additional areas on the first floor that were included in the project.
Have Questions about Your Lancaster Kitchen Remodel?
We offer free consultations to answer questions and help you discern the next step toward your remodeling goals.